Construction of mRNA competence center (vaccine production facility)

Client

n/a

Market

Pharmaceutical and biotechnology

Country

Germany

Status

Completed

Year

2023 - 2024

The facility is designed and executed as a part of the National Pandemic Preparedness Program of Germany. Required pace of the execution and the design stage at beginning of the project implied very complex design/construction interface, that meant for those two disciplines to be developed almost in parallel. As a result, the contracted scope multiplied. In these challenging circumstances, DECO had successfully managed and executed the works with quality that prompted the client to award us with annual quality reward.

Scope handled

  • Clean Media Pipelines
  • Black Media Pipelines
  • HVAC system

Together with the equipment procurement, manipulation and installation.

mRNA competence centre Halle 01
mRNA competence centre Halle 02
mRNA competence centre Halle 03